|

| |
Resume of James
Stromecki, PE (con't)
Relevant Experience, Other Projects:
New York State Thruway Authority,
Seneca County, NY
-
Bridge jacking procedures for two bridges,
each consisting of four-spans (totaling 229 ft in length) on Stone Church and Whiskey Hill
Roads. The purpose of the jacking was for bearing and pedestal replacement, as well as
installation of moment splices at the piers in order to make the spans continuous.
Bridge Over Erie Canal, Lockport, NY
Chemung Regional Wastewater Treatment
Facility, Chemung County, NY
New York State Department of
Transportation, LaSalle Interchange
Pool Projects:
-
North Forest Pool and Park, Amherst,
NY
-
North Forest Wave Pool, Amherst, NY
-
Jewish Center Pool, Buffalo, NY
Chautauqua Institute, Chautauqua, NY
-
Investigation of a turn of the century train station for floor loading
and repairs due to deterioration.
-
Investigation of a 5,000 sq ft, two-story, wood framed structure for conversion to
assembly space.
Cable Reinforced Fabric Structures:
-
Montreal Stadium, Montreal, Quebec,
Canada, Design of cable weldments for replacement roof.
-
Tampa Bay Baseball Stadium, Tampa, FL, Wind tunnel testing and design of an air-supported
roof structure.
-
Atrium Court, Newport Beach, CA, Design and construction of 12 modular crossed-arch units
for a renovated retail space.
-
Midway Mall, Sherman, TX, Design and construction of three cone structures for new retail
space.
-
Red Bird Athletic Arena, Illinois State University, Analysis of tensioned fabric roof
structure for loads during construction.
Thornwood Estates Subdivision, Town of
Wheatfield, NY
First Presbyterian Church of Tuscorara,
Mount Morris, NY
Langden Properties, 1165 Delaware
Avenue, Buffalo, NY
Boston Fire Hall, Boston, NY
Potter Real Estate, West Seneca, NY
City of Lackawanna, Lackawanna, NY
New York State Department of
Transportation, Niagara Falls, NY
-
Bridge erection procedure for a new 189
ft, three-span bridge with 10 girders, located on Route 62, Niagara Falls.
-
Bridge jacking procedure for five (5) bridges on the Robert Moses Parkway, in order to
facilitate bearing and/or pedestal replacement for:
-
Two bridges each consisting of a single-span, 115 ft in length
-
Two bridges each consisting of a single-span, 127 ft in length
-
One bridge consisting of a single-span, 234 ft in length.
Trinity Episcopal Church,
Buffalo, NY
-
Investigation, analysis, and design of a
turn-of-the-century church, constructed of stone and wood, for the installation of a new
three stop elevator.
Art Park, Lewiston, NY
|