Resume of James
Stromecki, PE (con't)
Relevant Experience, Institutional Projects:
Bethune Hall, SUNY at Buffalo, NY
World University Games Stadium, SUNY
at Buffalo, NY - 18,000 seat sports facility
-
Coordinate structural requirements with geo-technical investigation.
-
Design of cast-in-place concrete, including flat slab, columns, retaining walls, ramp
bridge, and caisson foundations.
-
Design of precast concrete framing system for spectator seating
-
Review shop drawings for conformance with the contract documents.
-
Follow construct progress for conformance with the contract documents.
Sidway School, Grand Island, NY
-
Structural engineering of a 30,000 sq ft
addition, consisting of a two-story classroom with basement, a full gymnasium, and a small
cafeteria addition.
-
Review shop drawings for conformance with the contract documents.
Positron Emission Tomography Facility,
SUNY at Buffalo, NY
-
Evaluation of existing structure for
suitability of the proposed facility.
-
Design of radiation-shielding vault for cyclotron.
-
Design of new mechanical room floor in high bay area.
-
Foundation design consisting of caissons, spread footings, and pits.
-
Review shop drawings for conformance with the contract documents.
-
Site visits during construction to observe that the work was in accordance with the
contract documents and to clarify questions and resolve field conditions..
Keshequa Central School District,
Nunda and Dalton, NY
-
Structural investigation of the roof
system to carry increased loading from proposed ballasted roofing.
-
Structural engineering for a new two stop hydraulic elevator to be installed in an
existing cast-in-place concrete building.
-
Structural engineering for a new 9 ft by 24 ft control room to be constructed using cold
formed products and concrete slab-on-deck.
-
Structural engineering for a new 28 ft by 44 ft raised roof to accommodate a new bus lift.
Patterson Library, Westfield, NY
-
Structural engineering of a multi-level
entrance addition in order to provide handicapped access to this turn-of-the-century
building. Project also included an elevator to connect the three levels, and a lift to
provide access from the new entrance level to the first floor.
-
Review shop drawings for conformance with the contract documents.
-
Site visit to resolve hidden field condition during construction.
Boy's and Girl's Club of East Aurora,
East Aurora, NY
-
Structural engineering for a 8200 sq ft,
two-story addition and a 1600 sq ft basement. The construction consisted of load-bearing
masonry walls, precast concrete hollow core plank floors, and open web steel joist roof
system.
Town of Evans Municipal Building,
Evans, NY
-
25,000 sq ft single-story structure with a
partial basement.
-
Design of steel roof system, masonry load-bearing walls, and foundations.
-
Review shop drawings for conformance with the contract documents.
Lockport Post Office, Lockport, NY
-
Project Engineer responsible for
coordinating structural, mechanical, electrical, and plumbing design with the architect.
-
Design of steel roof system, masonry walls, footings, loading dock, and retaining walls.
-
Site visits during construction to observe that the work was in accordance with the
contract documents.
Buffalo Memorial Auditorium, Buffalo,
NY
-
Evaluation of the existing structure for
retrofit of elevator hoistway into the existing steel-framed structure.
-
Design of concrete slab to support the mechanical room in an area which previously had
large settlements of the slab on grade.
-
Review shop drawings for conformance with the contract documents.
-
Site visits during construction to observe that the work was in accordance with the
contract documents.
Pilot Field, Pilot Field, Buffalo, NY
-
Design of structural steel and precast
concrete hollow core plank for additional mezzanine concession area.
-
Design of steel roof system and foundations for the concession building.
-
Review shop drawings for conformance with the contract documents.
-
Site visits during construction to observe that the work was in accordance with the
contract documents.
Springville-Griffith Institute Central
School District, Springville, NY
-
Structural engineering and drawing
preparation for a 17,200 sq ft single story addition for a new multipurpose room,
library/media center addition, and nine classrooms plus a 5000 sq ft basement.
North Park School, Lockport, NY
Nativity of Our Lord Parish Center,
Orchard Park, NY
-
14,000 sq ft, two-story addition,
including gymnasium, locker rooms kitchen, stage, and meeting rooms.
-
Design of structural steel roof and floor systems, pedestrian bridge, reinforced masonry
walls, and foundations.
Anna Merrit Elementary School,
Lockport, NY
City of Lackawanna, Lackawanna, NY
Diefendorf Hall, SUNY at Buffalo, NY
-
Schematic design for the installation of a
new five stop elevator into the existing 4 story classroom building.
-
Structural engineering and drawing preparation for modifications to the steel framed
building for the new elevator hoistway.
-
Review shop drawings and make site visits to confirm conformance with the contract
documents and discuss field conditions.
Cary Faber Sherman Hall, SUNY at
Buffalo, NY
Trinity Episcopal Church,
Buffalo, NY
-
Investigation, analysis, and design of a
turn-of-the-century church, constructed of stone and wood, for the installation of a new
three stop elevator.
School 23, Buffalo, NY
-
Structural investigation of a 70,000
square foot, 3 story, school constructed in 1896, of masonry and wood, and the 1928
addition, constructed of steel and concrete for adaptive reuse and necessary repairs.
Buffalo Psychiatric Center, Buffalo,
NY
-
Structural investigation of a 6 story
hospital building, constructed in the mid 1940s, and an 8 story hospital building,
constructed in the early 1960s, for new uses.
Chautauqua Institute, Chautauqua, NY
-
Investigation of a turn of the century
train station for floor loading and repairs due to deterioration.
-
Investigation of a 5,000 sq ft, two-story, wood framed structure for conversion to
assembly space.
Art Park, Lewiston, NY
Canisius College, Buffalo, NY
-
Structural engineering for renovations to
Bosch and Frisch Halls. Modifications included supporting new roof top HVAC units, new
floor slabs to fill an elevator shaft, and new floor openings for ductwork.
Springville-Griffith Institute Central
School District, Colden, NY
-
Structural engineering and drawing
preparation for a 17,800 sq ft single story addition for a new gymnasium, locker rooms,
library/media center, four classrooms, and 2,800 sq ft second story mechanical
room.
John Bean Center, SUNY at Buffalo, NY
- Structural investigation/analysis into the
probable cause of collapse of the 80 foot aluminum flagpole. Testing of the
adjacent two flag poles to investigate possible flaws that might also lead to
potential failure.
Gasworks, Buffalo, NY
|