untitled04.bmp (50078 bytes)

 

untitled03.bmp (69478 bytes)

Resume of James Stromecki, PE (con't)

Relevant Experience, Commercial Projects:

Lockport Savings Bank, Hamburg, NY

  • Structural engineering for a 5,000 sq ft bank that included a UL Class 2 vault, three remote teller lanes, an automatic teller lane, and a 42 foot square lobby/teller area that is vaulted and column free. The construction utilized a minimum of steel framing, steel web wood joists, and conventional wood framing supported on a spread foundation.

  • Review shop drawings for conformance with the contract documents.
    Site visits during construction to observe that the work was in accordance with the contract documents.

Fleet Bank, Buffalo, NY

  • Design of a new handicapped ramp and entrance vestibule modifications for ADA compliance and a new automatic teller machine.

Lehigh Construction Group, Orchard Park, NY

  • Structural engineering and drawing preparation for a 6,800 sq ft office and 5,700 sq ft warehouse building utilizing steel bar joists and load bearing masonry.

Orchard Park Orthopedics, Orchard Park, NY

  • Structural design of a 14 ft x 52 ft addition to an existing medical facility. Design included three options for the roof framing to accommodate scheduling, masonry walls, and foundation.

Fallside Resort, Niagara Falls, NY

  • Structural analysis and design of cold-formed steel trusses for a new 20 ft x 52 ft entrance canopy.

Horschel Reality, Springville, NY

  • Structural engineering for a 24,000 sq ft machine shop with provisions for a future addition and a 6,800 sq ft office. The building is constructed of load bearing masonry walls and steel roof joists supported on shallow footings.

Langden Properties, 1165 Delaware Avenue, Buffalo, NY

  • Structural investigation into the cause of the deterioration of the precast concrete and brick parapet of a late 1920's apartment building.

Potter Real Estate, West Seneca, NY

  • Site drainage study and grading plan for a one-half acre site to be used for a new building addition and a new parking lot.

Lockport Savings Bank, Orchard Park, NY

  • Structural engineering for a 4,700 sq ft bank that included a UL Class 2 vault, three remote teller lanes, and an automatic teller lane. The construction utilized load-bearing masonry, steel  joists, and some structural steel supported on a spread foundation.

  • Review shop drawings for conformance with the contract documents.

  • Site visits during construction to observe that the work was in accordance with the contract documents.

Baxter Healthcare, Depew, NY

  • Structural engineering for a 153,000 sq ft steel framed warehouse and office building.

Clover Management, Inc., Williamsville, NY

  • Investigation of a 66,000 sq ft six story load bearing masonry building to repair cracking in the exterior brick and block walls.

  • Site visits during construction to verify conformance with the construction documents.

BJ’s Wholesale Plaza, Allegheny, NY

  • Structural engineering and drawing preparation for a 250,000 gallon cast-in-place concrete underground water storage reservoir designed to support HS-20 truck traffic above.

  • Review shop drawings and submittals and site visits to confirm conformance with the construction documents.

Marine Midland Arena, Buffalo, NY

  • Structural engineering for a fall protection system consisting of seven cable layouts with over 2,800 lineal feet of cable.