Institutional Projects (con't)
Reinstein Library, Cheektowaga, NY
-
Investigation into the cause of the
deterioration of the glued, laminated beams and columns exposed to the weather since the
original 1969 construction.
-
Prepare recommendations for procedures to repair the damage as well as remedial measures
to avoid damage in the future.
Art Park, Lewiston, NY
Panama Central School, Panama, NY
-
Structural and foundation design of a
two-story, 5,300 sq ft classroom addition and a three-story, 16,000 sq ft kitchen and
classroom addition. Both additions were steel-framed with concrete slab on deck floors.
Carey Faber Sherman Hall, SUNY at
Buffalo, NY
Sidway School, Grand Island, NY
-
Structural design of a 30,000 sq ft
addition, consisting of a two-story classroom with basement, a full gymnasium, and a small
cafeteria addition.
|