Institutional Projects (con't)

Reinstein Library, Cheektowaga, NY

  • Investigation into the cause of the deterioration of the glued, laminated beams and columns exposed to the weather since the original 1969 construction.

  • Prepare recommendations for procedures to repair the damage as well as remedial measures to avoid damage in the future.

Art Park, Lewiston, NY

  • Structural engineering of timber framed bowstring roof trusses for the 1,500 sq ft concession building.

Panama Central School, Panama, NY

  • Structural and foundation design of a two-story, 5,300 sq ft classroom addition and a three-story, 16,000 sq ft kitchen and classroom addition. Both additions were steel-framed with concrete slab on deck floors.

Carey Faber Sherman Hall, SUNY at Buffalo, NY

  • Structural engineering for the installation of a new air handling units and 15,000 pound chiller located on the roof of an existing structure.

Sidway School, Grand Island, NY

  • Structural design of a 30,000 sq ft addition, consisting of a two-story classroom with basement, a full gymnasium, and a small cafeteria addition.