Commercial Projects (con't)
Mayer Bros. Apple Products, Inc.,
West Seneca, NY
-
Design of a new four door loading dock to
be installed in an existing facility.
-
Design of a foundation for two 30,000 gallon water storage tanks supported on caissons.
KOA Campground, Grand Island, NY
-
Site development of the campground,
including campsite locations, road network, storm water detention, sanitary and potable
water systems, site amenities, such as pedestrian bridges and plantings, and a
recreational building including changing area, shower and rest room facilities.
Mayer Brothers Apple Products, Inc,
West Seneca, NY
-
Determine with owner the requirements of a
new cider pressing facility. The architectural and structural design included a concrete
basement, steel beam-supported, concrete first-floor slab, wood roof truss system
supported by steel beams and columns.
US Postal Service, Honeoye, NY
-
Design of a 3,000 sq ft Post Office for
Honeoye, New York, constructed of load-bearing masonry and truss roof.
-
The project included all architectural and structural drawings, and specifications, as
well as the review of shop drawings.
Liberty Building, Buffalo, NY
-
Design of a heat exchanger and cooling
tower supports for chilled water renovations.
-
Design of a new equipment room in an area excavated under the overhang of the existing
building, in order to accommodate legal egress from two occupancies.
Shopping Plaza, Amherst, NY
-
Site development of a 2.3 acre parcel, and
the structural design of a 19,000 sq ft steel-framed building to house retail stores and a
bank. The bank facility included a drive-up area with applicable automobile stacking
requirements.
Fleet Bank, Buffalo, NY
Buffalo Material Handling Corporation,
Clarence, NY
-
Design and preparation of a complete set
of contract documents for a 3,000 sq ft office of load-bearing masonry, also for an
attached 12,000 sq ft warehouse utilizing a rigid frame superstructure.
Sahlen’s Sports Park, Elma, NY
-
A 12,000 sq ft
pre-engineered building addition with a locker room addition of
approximately 2,000 sq ft.
-
Development of the
structural system, loading, and serviceability requirements of the
pre-engineered building.
-
Structural engineering and
drawing preparation for the pre-engineered building’s foundation and the
locker room addition.
|