Work experience - 35 plus Years

Johnson Controls, Inc. 9/71 - 3/97

Falmouth, ME; Manati, Puerto Rico; Burlington, Vermont; Woburn, MA.

Job titles
Projects Manager, Installation Manager, Engineering Manager, Projects Engineer, Pneumatic/Electronic Engineer, Fluid Engineer, Technical Representative & Service Applications Engineer.

Responsibilities
Planning, scheduling, billing, collection, sales support, union labor relations, subcontracts, estimating, design systems, order materials, commissioning, troubleshooting and training customers.

Major customers
Bowdoin College Brunswick, ME; Colby College Waterville, ME; University of Maine at Orono, Maine; University of Vermont Burlington, Vt.; The Jackson Laboratory Bar Harbor, ME; Veterans Administration of Togus, ME; Veterans Administration of White River Jct., Vt.; Portland Museum of Art Portland, Maine; One & Two Portland Square Portland, Maine; Maine Medical Center Portland, ME; Brighton Medical Center Portland, ME; Roche Pharmaceutical Manati, Puerto Rico.

Marshview Consultants 3/97 - current

Freelance controls contractor

¥  Controls application engineering subcontractor to Siemens Building Technology/Landis Division.
* 21 projects worth almost 4 million dollars: 16 for the Falmouth, ME office; 4 for the Albany, NY office and 1 project for the Boston, MA office.
* Scarborough, Me office: Conway NH Schools & Maine State Prison Warren, ME.

¥  Controls application engineering and installation subcontractor to Hughes Engineering & Controls [Honeywell & Tridium Controls] of Freeport, ME.
* 2 projects at Naval Air Station, Brunswick, ME.
* 24 projects at Maine Air National Guard, Bangor, ME.
* DDC project at Maine Air National Guard, South Portland, ME.
* Electric controls project at Naval Survival School [SARE], Rangeley, ME.
* Deicing project at Maine Air National Guard, Bangor, ME.
* Electric Submetering project at Maine Air National Guard, Bangor, ME.

¥  Controls application engineering subcontractor to Moreau Electric [Johnson Controls ABCS] of Lewiston, ME.
* Design and software applications for 15 projects.

¥  Designed a controls system for the PICS building at the University of Maine, Orono, ME.

¥  Controls application engineering subcontractor to Johnson Controls, Windsor, CT.
* Retrofit chiller controls at Buckley Sch. CT.
* New DDC/FMS controls & software for Tolland High School, Tolland, CT.

¥  Controls application engineering subcontractor to Elec. Maintenance & Controls [Johnson Controls ABCS], Cranston, RI.
* Retrofit DDC for 19 buildings at Bridgewater State College, Bridgewater, MA.

¥  Existing controls review & controls application engineering subcontractor to Siemens, Scarborough, ME. for Performance Contracting project of 7 schools in Maine.

¥  Quality Assurance subcontractor to Siemens, Scarborough, ME. for DDC of FDA project at Stryker Corp, Lebanon, NH.

¥  Controls Startup Services to Johnson Controls, Boston, MA.
* Chiller controls startup at Boston College Merkert Science, Boston, MA.
* AHU controls startup at Boston College Higgins Hall, Boston, MA.

Controls Specification

¥  Developed control specifications for EMS upgrade for One & Two Portland Square Office buildings Portland, ME.
¥  Developed control specifications for EMS upgrade and commissioning control systems for the University of Vermont Burlington, VT.
¥  Developed FMS performance specification for Combined Energies of Augusta, ME., for their customer the VA in Togus, ME., for the replacement of an existing Delta 1000 system in 20 buildings.
¥  Developed ATC performance specification for Combined Energies of Augusta, ME., for their customer the Naval Station in Newport, RI., for the replacement or extension of existing controls in 29 buildings.
¥  Developed control specifications for DDC changes at Philips Academy, Elson Art Ctr., Andover, MA for SED engineering Boston, MA.
¥  Developed control drawings & sequences for DDC at Merriam Admin/Elem School, Acton, MA for SED engineering Boston, MA.

Controls Analysis

¥  Reviewed DDC controls at the University of Vermont Burlington, VT., Old Mill & Lafayette Halls and reported variances and provided follow-up plan. Later came back and made software modifications to 10 air-handling systems and central heating and cooling plant controls.
¥  Reviewed pneumatic controls & report for Massachusetts Maritime Academy; Student Union, Gym, 4 Dorms & Admin Bldg, Buzzards Bay, MA.
¥  Reviewed existing controls for future DDC system at Merriam Admin/Elem School, Acton, MA for SED engineering Boston, MA.
¥  Reviewed existing DDC controls to determine the cause of the 6 RTU frozen coils on two separate occasions at Wentworth Institute of Technology, Bldg 610, Boston, MA for SED engineering Boston, MA.

Controls Commissioning

¥  Controls commissioning agent for the Rubenstein Ecosystem Science Laboratory at the Universities of Vermont, Burlington, VT.
¥  Controls commissioning agent for the Flagg Adams Middle School in Holliston, Massachusetts.
¥  Controls commissioning agent for the Health Science Research Facility at the Universities of Vermont in Burlington, VT.
¥  Controls commissioning agent for the Holliston High School in Holliston, Massachusetts.
¥  Controls commissioning agent for the Living & Learning Center at the Universities of Vermont in Burlington, VT.
¥  Controls commissioning for Philips Academy, Elson Art Ctr., Andover, MA
¥  Controls commissioning for Combined Energies project, Naval Marine Corp Reserve Ctr., Worcester, MA.

Expert Witness

¥  Worked with mechanical engineer William A. Lotz P.E. for the Law firm of Richardson, Whitman, Large & Badger of Portland on a frozen coil case where digital controls were used.

Software Development

¥  Converted DOS VersaCAD symbols to VISIO smartshape technology CAD system.

Skills

Software:

¥  Digital & Energy Management:
JC8540, CAL1, Metasys PMI & GPL, Metasys HVACPRO, Metasys DX9100 & Metasys Companion.

¥  Estimating and Design:
AIM, PRESTO MSWord, MSExcel, VISIO CAD, Timeline [CPM], QuickPen Project management & AutoCAD.

¥  Other:
ProComm, PCAnywhere, Lotus CCmail, Eclipse Fax, MSPowerPoint, MSVisual Basic, Quicken, QuickBooks Pro, Photoshop, Acrobat Exchange, MiniCAD, IntelliCAD, and the Internet.

¥  Operating Systems:
DOS, Windows & Macintosh.

Other:

¥  Estimate Control Systems.
¥  Design Digital, Electric & Pneumatic Control Systems.
¥  Startup Digital, Electric & Pneumatic Control Systems.
¥  Manage Projects.
¥  Air Balance.
¥  Controls Installation.

Specific Applications

Brighton Medical Center, formerly Osteopathic Hospital

Performed monthly exhaust fan air balance readings for government pressure compliance.

Project managed the digital controls installation portion of a large performance contracting project to convert all pneumatic controls to Metasys DDC.

Maine Medical Center

Air balanced their only air-handling unit serving 10 operating rooms. Recommended that several smaller AHU's be installed in lieu of the one larger air-handling unit to provide operating room & mechanical equipment flexibility.

Roche Pharmaceutical Manati, Puerto Rico.

Commissioning Group Leader to startup all the pneumatics & some of the JC80 products and systems for this very large Valium manufacturing facility.

Portland Museum of Art

Engineered and commissioned the pneumatics and pneumatic integrated controllers (PIC) for this project designed by I.M. PEI.

Bowdoin College, Colby College, UN of Maine, Un. Of Vermont, VA, and others

Project managed, engineered and commissioned many systems over 20 years for these customers.

The Jackson Laboratory - Genetics & Mouse Production.

Commissioned the Metasys controls for 2 new, fire damaged replacement buildings.

Worked with the owner and their mechanical engineer to develop a digital controls system to be used for the multi phase construction planned for new mouse houses over several years. Designed and commissioned the controls for the new mouse houses.