Machine Shop
Projects
 


Repairing The front axle casting for a Baker steam engine
The casting was heated in the forge and welded then it was finish bored


The casting with the new axle fitted


The wheels for the engine were bored to fit the new axle

The outer wheel hub was cracked it was turned in the mill
A steel support ring was heated and driven on

Pouring and machining the babbit clutch bearing for the Baker steam engine
 
 
 

New babbit has been poured in the clutch pulley for a large Charter gas engine
It is being bored to size

Steps in repairing a broken crank bearing flange for an International  10-20 or T-20

Surfacing the head and manifold for my T-35  International Crawler

 Return to the Machine Shop Page

 The Parts Page

 International Harvester Page
 

 Klossner@worldnet.att.net