Weekend 3: April 16, 17 & 18, 2004

The Third weekend came and went. We got a lot done and it all went quite well. We removed the fuselage after we fitted it so I could paint the inside of the hull with a Silver-Gray ZolaTone splatter finish (Auto, industrial and Marine) $37.95 per quart looks great. It gives a nice contrast to all of the Aluminum and adds very little weight.

Weekend 3: 4:00 AM Saturday I seem to have woke up the Supervisor
4:00 AM Saturday I seem to have woke up the Supervisor
Weekend 3: Standing on its own three legs Saturday morning
Standing on its own three legs, Saturday morning.
Weekend 3, Saturday Night: Fuselage and Joysticks installed.
Fuselage and Joysticks installed.
Weekend 3: Nice contrast? Would look better if we had seats!
Nice contrast? Would look better if we had seats!
Weekend 3 - Sunday: Throttle and brake lever installed.
Sunday: Throttle and brake lever installed.
Weekend 3: Over locks, Aileron Tie rods and Bell crank
Over locks, Aileron Tie rods and Bell crank.
Weekend 3:, Elevator Push-pull tube, over sleeve and guide.
Elevator Push-pull tube, over sleeve and guide.
Weekend 3: All of the Flight Controls installed
All of the Flight Controls installed.
Weekend 3:Sunday afternoon JJ and David relaxing a bit (load & stress testing)
Sunday afternoon JJ and David relaxing a bit
(load & stress testing).

Weekend 4: April 23, 24 & 25, 2004

It was quiet and lonely, but I got a lot done: fitting and lubing the cables and control links, plumbing the fuel tank and the bilge pump, (Note to self: Install bilge pump before installing the fuel tank/fuselag,) played with the bungee cords, and made motor sounds & wished we had the seats. Maybe next week we'll install the Turtle Deck.

Weekend 4: Cable routing
Cable routing
Weekend 4: Cable routing
Cable routing.
Weekend 4: Bilge pump
Bilge pump
Weekend 4:flaps controls and plumbing.
Flaps controls and plumbing.
Weekend 3:Tail wheel  retracted
Tail wheel retracted.
Weekend 3:fun with a scanner .
Fun with a scanner.

Weekend 5: April 30, May 1 & 2, 2004

We got a lot of the little things done, from Painting the inside of Turtle Deck with ZolaTone, installing the Gear Boots, Trim, Turtle Deck, wiring and wheel alignment.

Weekend 5: The Trim
The Trim
Weekend 5: Started the Water Rudder
Started the Water Rudder.
Weekend 5: The Trim Installed
The Trim installed.
Weekend 5: The Turtle Deck Fits
The Turtle Deck Fits.
Weekend 5: The Turtle Deck Fits
 
Weekend 5: The Turtle Deck Fits
 
Weekend 5: Next Weekend more fitting
Next Weekend more fitting.
Weekend 5: And the Stabilizer & Elevator
And the Stabilizer & Elevator.