Next will be to clean up the subframe you see, then paint
it and the control arms with POR-15.
Then I need to order a set of PST polygraphite bushings
and sway bar so I can reassemble everything.
Then comes the task of setting the 455 and 200r4 in.
I'll need a custom driveshaft to mate up to the
3.73 12-bolt I built. I hope to have some details and
pics of it soon.