Douglas J. Tobin, PE, RA
Registered Architect
Professional Engineer
Resume - Last Updated 08.24.2001
AREAS OF EXPERTISE
- Airport Master Planing & Design
- Baggage Handling Systems Design and Engineering
- Building and Facility Architecture, Electrical, Fire-Protection, HVAC, Structural Engineering
- Cargo Handling Systems Design and Engineering
- Concessions Master Planing & Design
- Package Handling Systems Design and Engineering
- Project Director, Program Management, Construction Management
- System and Building Interface Architecture and Engineering
- Warehouse Facility and Material Handling Systems Architecture and Engineering
PROFESSIONAL REGISTRATIONS
1.0 Architectural Registrations
- Connecticut 3559
- Florida AR0012063
- Kentucky 4268
- Illinois 001-010926
- Mass 5779
- New York 016665-1
- Georgia 10001
2.0 Professional Engineer Registrations
- Connecticut 15545
- Maine 7401
- New York 066450-1
- Pennsylvania PE-040450-R
- Vermont 18-0006694
3.0 Professional Organizations
- NCARB Registered Architect
- New York Society of Architects
- NSPE
4.0 Professional Experience
- Professional experience includes:
- Architectural, Structural, Mechanical, Electrical, Fire Protection Building Systems Planning, Design and Engineering
- Specialty Baggage Handling, Cargo, Freight Handling Systems Design and Engineering
- Concessions Design, Planning and Engineering
- Control Systems Design, Planning and Engineering, MCC, PLC, Controls, Sensors and Software planning and overall process control project development.
- Project Direction, Program Management and Construction Management
- Architecture and Engineering of major projects for Airport Cargo and Passenger Terminals located throughout the US and the World. Internationally at the New Athens
International Airport, Greece; New Seoul International Airport, Korea; Changi International Airport, Singapore; Kuala Lumpur International Airport, Kuala Lumpur Malaysia;
HACTL Cargo Terminals 1 and 2, Tai Tak International Airport, Hong Kong; Milano Linate and Milano Malpensa Airports, Milan Italy...etc. Projects include numerous Baggage,
Cargo, and Material Handling Systems. Mr Tobin has developed over 2 billion US Dollars worth of projects within the US and Internationally on commercial and industrial
projects.
5.0 Airport Passenger Terminal & Baggage Handling Systems Projects :
- San Francisco International Airport
- International Terminal
- Baggage Handling Systems
- Baggage Handling Systems Design Consultant
- BHS Numerical Analysis and Systems Evaluation
- Control Systems Specifications and Design Consultant
- Project Value: $ 50,000,000
- Project Completion: Current
- New Athens International Airport
- Spata, Greece
- Baggage Handling Systems Design Consultant
- BHS Numerical Analysis and Systems Evaluation
- Specifications, X-Ray, Transfer, Early Bag Systems
- Project Management Development Reports
- Project Value: $ 60,000,000
- Project Completion: Current
- New Seoul Korea International Airport
- Young Jong - Yong Yu Do
- JungGu, Inchon Korea
- Baggage Systems Consultant Team
- Douglas J. Tobin Responsible for;
- Contract Negotiations, Project Mgm't
- Project Value: $ 200,000,000
- Project Completion : 1997
- Albany Municipal Airport
- Albany, NY
- Temporary Passenger Terminal
- FIS Terminal Relocation Project
- Douglas J. Tobin Responsible for;
- Building Architecture and Engineering
- Project Value: $ 700,000
- Value Engineering (VE) Study for
- New York Port Authority
- International Arrivals
- Building Redevelopment (IAB)
- Passenger Terminal & Baggage Systems Consultant Team
- Project Value: $ 29,500,000
- Project Completion: 1996
- Greater Buffalo International Airport
- DKI Engineering USA with ARC Associates
- Douglas J. Tobin Responsible for;
- Master Plan - Baggage Handling Systems
- Buffalo, New York
- Project Value: $ 2,000,000
- Project Completion: 1995
- Newark International Airport
- Value Engineering study for the
- New York Port Authority
- New FIS Terminal
- Developed ten areas which PANY
- could save $ 600,000 on the
- Baggage Handling Systems.
- Project Completion: 1994
- JFK 2000 - Master Plan
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Baggage System Concept 3 Design
- Project Construction Cost : $ 3,000,000
- Project Completion : 1988
- Venice International Airport - Master Plan - 2010
- Douglas J. Tobin Responsible for;
- Passenger Terminal Design Development
- Venice, Italy
- Project Construction Cost : $ 3,000,000
- Project Completion : 1988
- SEA Linate - Milano-Linate International Airport
- Milan, Italy
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Baggage Handling System Design
- Specification Documents
- Project Construction Cost : $ 3,000,000
- Project Completion : 1986
- SEA Milan
- Milano-Malpensa International Airport
- Milan, Italy
- Douglas J. Tobin Responsible for;
- MXP-2000 Master Planning BHS
- and Cargo Terminal Areas
- Project Construction Cost : $ 200,000,000
- Project Completion : 1986
- British Airways - JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Baggage Handling Systems Engineering
- Project Construction Cost : $ 3,200,000
- Project Completion : 1985
- Port Authority - JFK Master Plan
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Baggage Handling Systems Engineering
- Project Construction Cost : $ 200,000,000
- Project Completion : 1984
- United Airlines - Airport Passenger, Freight, Mail
- Baggae Handling Underground Terminal Master Plan
- O'Hare International Airport
- Chicago, Ill.
- Baggage Handling Systems Design and Engineering
- Project Construction Cost : $ 200,000,000
- Project Completion : 1983
- Alitalia - Passenger Terminal Baggage Handling
- DaVinci International Airport
- Rome, Italy
- Douglas J. Tobin Responsible for;
- BHS System Design and Engineering
- Project Construction Cost : $ 5,000,000
- Project Completion : 1981
- SEA - Passenger Terminal Baggage Handling
- Milano-Linate International Airport
- Milan, Italy
- Douglas J. Tobin Responsible for;
- BHS System Design and Engineering
- Project Construction Cost : $ 3,000,000
- Project Completion : 1981
- United Airlines - Design and Renovation
- Denver International Airport
- Denver, Colo.
- Douglas J. Tobin Responsible for;
- Baggage Handling Systems Engineering
- Project Construction Cost : $ 2,500,000
- Project Completion : 1981
6.0 Airport Cargo, Freight / Material Handling Systems Projects :
- Advance Cargo Systems - Aerofloral - Frontier Airlines Cargo SA
- X-Ray Facility - Cargo Terminal Building 701
- Miami International Airport Cargo Area
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Architectural Engineering
- MHS Engineering Cargo Systems
- Overall Project Master Plan
- Project Director - Construction Management
- Engineering & Design - MHS Engineering, Cargo Systems
- Phase 1A Project Value: $ 3,500,000
- Project Completion :1999 - Beneficial Use and Occupancy 7/1999
- Aerofloral - Aerokool - Frontier Airlines Cargo SA
- Warehouse - Cargo Terminal Building
- Miami International Airport Cargo Area
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Architectural Engineering
- MHS Engineering Cargo Systems
- Tilt-Tray Sorter Freight Sytems Engineering
- Automatic Depaletizer Systems Engineering
- Office Architecture and Engineering
- Project Director - Construction Management
- Engineering & Design - MHS Engineering, Cargo Systems
- Phase 1A Project Value: $ 6,500,000
- Project Completion :1998 - Beneficial Use and Occupancy 9/1998
- Phase 1B Project Value: $ 1,200,000
- Project Completion: 1999 - Beneficial Use and Occupancy 01/1999
- Phase 2 Project Value: $ 8,500,000
- Project Completion:2000 Under Preliminary Planning
- Tampa Airlines Cargo SA
- MIA-CFS - Cargo Terminal Building 708
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Architectural Engineering
- MHS Engineering Cargo Systems
- Office Architecture and Engineering
- Communications and Security Systems Engineering
- Project Director - Construction Management
- Prelim. Design - MHS Engineering, Cargo Systems
- Project Value: $ 2,200,000
- Project Completion :1998
- MIA-CFS - Cargo Terminal Building 706
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Architectural Engineering
- MHS Engineering Cargo Systems
- Office Architecture and Engineering
- Project Director - Construction Management
- Project Value: $ 1,200,000
- Project Completion :1997
- MIA-CFS - Cargo Terminal Building 707
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Prelim. Design - MHS Engineering, Cargo Systems
- Project Value: $ 1,200,000
- Project Completion : 1995
- Carisam International Corp.
- Duty Free International Inc.
- Douglas J. Tobin Responsible for;
- Material Handling Systems
- Miami Carisam Warehouse Project
- Miami, Florida
- Project Construction Cost : $2,300,000
- Material Handling Systems : $ 1,250,000
- Project Completion : 1993
- ISO Container Storage Park
- Architectural Design Development
- Project Engineering
- Douglas J. Tobin Responsible for;
- Site Planning, MHS Engineering
- Project Construction Cost : $ 250,000
- Project Completion : 1989
- MIA-CFS - Cargo Terminal
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- MHS Engineering
- Project Construction Cost : $ 500,000
- Project Completion : 1989
- HACTL Cargo Terminal 2 Expansion
- Hong Kong
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Project Construction Cost : $ 3,000,000
- Project Completion : 1988
- Japan Airlines - JFK Master Plan
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Cargo Complex Development
- Project Construction Cost : $ 3,000,000
- Project Completion : 1988
- Federal Express - Newark Freight Terminal
- Port Authority Submittals
- Douglas J. Tobin Responsible for;
- Code Compliance Studies
- Newark International Airport
- Newark, N.J.
- Project Construction Cost : $ 25,000,000
- Project Completion : 1987
- Pan Am Cargo Terminal Relocation
- Miami International Airport
- Douglas J. Tobin Responsible for;
- Material Handling Systems Engineering
- Miami, Florida
- Project Construction Cost : $ 250,000
- Project Completion : 1987
- SATS Terminal 1A - 4A Expansion
- Cargo Terminal Architectural Engineering
- Douglas J. Tobin Responsible for;
- Material Handling System Engineering
- Mechanical Engineering
- Project Construction Cost : $ 40,000,000
- Project Completion : 1987
- Miami International Airport
- Miami Container Freight Station
- Miami International Airport
- Miami, Florida
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Project Construction Cost : $ 235,000
- Project Completion : 1986
- Emery Worldwide - Stage IV A - Phase 1
- Dayton Hub Expansion
- Dayton Airport
- Dayton, Ohio
- Douglas J. Tobin Responsible for;
- Structural Engineering,
- Fire Protection
- Project Construction Cost : $ 10,000,000
- Project Completion : 1986
- Pan Am Cargo Terminal Relocation Study
- Site Master Plan
- Hangar 14 Cargo Terminal Conversion
- Office Relocation
- JFK International Airport
- New York, N.Y.
- Project Construction Cost : $ 15,000,000
- Project Completion: 1986
- SEA Milan
- Milano-Malpensa International Airport
- Milan, Italy
- Douglas J. Tobin Responsible for;
- MXP-2000 Master Planning
- Cargo Terminal Areas
- Project Construction Cost : $ 200,000,000
- Project Completion : 1986
- United Air Lines - Cargo Terminal
- O'Hare International Airport
- Chicago, Ill.
- Douglas J. Tobin Responsible for;
- Design Development and Master Planning
- Architectural Design and Engineering
- Project Construction Cost : $ 20,000,000
- Project Completion : 1986
- Efficiency Systems - Japan Air Lines
- Cargo Terminal Revisions
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Material Handling Systems Engineering
- Structural Engineering
- Project Construction Cost : $ 350,000
- Project Completion : 1985
- Federal Express - MLD Center
- Logan International Airport
- Boston, Mass.
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Material Handling Systems Engineering
- Project Construction Cost : $ 450,000
- Project Completion : 1985
- Miami International Airport
- Cargo City 1 and Cargo City 2
- Douglas J. Tobin Responsible for;
- Master Planning
- Structural Engineering
- Miami, Florida
- Project Construction Cost : $ 15,000,000
- Project Completion : 1985
- Federal Express - Boston BABO Facility
- Interior Office Design
- Cargo Terminal Conversion
- Logan International Airport
- Boston, Mass.
- Douglas J. Tobin Responsible for;
- HVAC, Fire Protection Engineering
- Project Construction Cost : $ 450,000
- Project Completion : 1984
- Malaysian Airlines Systems - Cargo Terminal Design
- Kuala Lumpur, Malaysia
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Material Handling Systems Engineering
- Project Construction Cost : $ 20,000,000
- Project Completion : 1984
- SATS - Master Plan Cargo Development
- Feasibility Study
- Cargo Terminal Expansion
- Singapore
- Project Construction Cost : $ 40,000,000
- Project Completion : 1984
- Emery Worldwide - Stage III - Dayton Hub Expansion
- Dayton Airport
- Dayton, Ohio
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Fire Protection
- Project Construction Cost : $ 10,000,000
- Project Completion : 1983
- Emery Worldwide - Hub Terminal Debottlenecking
- Dayton Hub Terminal
- Dayton Airport
- Dayton, Ohio
- Project Construction Cost : $ 1,000,000
- Project Completion : 1983
- Northwest Airlines - Cargo Terminal Design
- Logan International Airport
- Boston, Mass.
- Douglas J. Tobin Responsible for;
- Building Architecture
- Structural Engineering
- Project Construction Cost : $ 5,000,000
- Project Completion : 1983
- United Airlines - Airport Passenger, Freight, Mail
- Terminal Master Plan
- O'Hare International Airport
- Chicago, Ill.
- Project Construction Cost : $ 20,000,000
- Project Completion : 1983
- Air Express International
- Air Freight Terminal
- Architectural Design Development
- JFK International Airport
- New York, N.Y.
- Project Construction Cost : $ 5,000,000
- Project Completion : 1980
- Cargo Terminal Renovation - Cargo Systems Expansions
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Material Handling Systems Engineering
- Structural Engineering
- Project Construction Cost : $ 3,000,000
- Project Completion : 1982
- Emery Worldwide - Hub Terminal Envelope Sortation
- Dayton International Airport
- Dayton, Ohio
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Material Handling System Engineering
- Project Construction Cost : $ 1,200,000
- Project Completion : 1982
- Emery Worldwide - Freight Terminal Design
- O'Hare International Airport
- Chicago, Ill.
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Material Handling System Engineering
- Project Construction Cost : $ 8,000,000
- Project Completion : 1982
- HACTL Cargo -Terminal 1A Expansion
- Hong Kong
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Material Handling Systems Engineering
- Project Construction Cost : $ 50,000,000
- Project Completion : 1982
- SAS - Cargo Terminal Design
- Arlanda, Sweden
- Douglas J. Tobin Responsible for;
- Architectural Design Development
- Project Construction Cost : $ 9,000,000
- Project Completion : 1982
- Emery Worldwide - Hub Terminal Design - Phase 1
- Airport Master Planning - Dayton Airport
- Dayton, Ohio
- Douglas J. Tobin Responsible for;
- Airport Master Planning
- Project Construction Cost : $ 200,000,000
- Project Completion : 1981
- British Airways
- Cargo Terminal Port Authority
- Documentation and Submittals
- JFK International Airport
- New York, N.Y.
- Project Construction Cost : $ 250,000
- Project Completion : 1980
- AEI - Freight Terminal Study
- Newark International Airport
- Newark, N.J.
- Douglas J. Tobin Responsible for;
- Cargo Terminal Plannning and Structural Engineering
- Project Construction Cost : $ 250,000
- Project Completion : 1979
- Emery Worldwide
- Air Freight Terminal Design
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Cargo Terminal Planning
- Structural and Mechanical Engineering
- Project Construction Cost : $ 1,000,000
- Project Completion : 1979
- Eastern Airlines
- Air Freight Terminal Design
- Atlanta Hartsfield International Airport
- Atlanta, Georgia
- Douglas J. Tobin Responsible for;
- Cargo Handling Systems Engineering
- Structural and Mechanical Engineering
- Project Construction Cost : $ 2,300,000
- Project Completion : 1979
- AEI - Air Freight Terminal Design
- O'Hare International Airport
- Chicago, Ill.
- Douglas J. Tobin Responsible for;
- Cargo Handling Systems Engineering
- Structural and Mechanical Engineering
- Project Construction Cost : $ 15,000
- Project Completion : 1978
- AEI - Air Freight Terminal Design
- Frankfurt International Airport
- Frankfurt, West Germany
- Douglas J. Tobin Responsible for;
- Cargo Handling Systems Engineering
- Structural and Mechanical Engineering
- Project Construction Cost : $ 210,000
- Project Completion : 1978
- Miami Airport Authority
- Cargo Terminal Area Master Plan
- Miami International Airport
- Miami, Florida
- Douglas J. Tobin Responsible for;
- Airport Cargo Termianl Master Planning
- Project Construction Cost : $ 10,000,000
- Project Completion : 1978
7.0 Airport Concessions Projects :
- Weitnauer America, Inc.
- Weitnauer America Duty Free Shop
- Termianl C - Concourse 3
- Newark International Airport, NJ
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 1,200,000
Project Completion : 10/2001
- World Duty Free, Americas, Inc.
- British Airways Duty Free Shop
- British Airways Terminal
- JFK International Airport, NY
- Douglas J. Tobin Responsible for;
- Turnkey Engineering
- Project Construction Cost : $ 2,400,000
- Project Completion : 03/2000
- World Duty Free, Americas, Inc.
- Chicago Midway WDFA Temporaries
- Terminal A, B, C Concourse's
- Various News & Gifts Architecture and Engineering
- Midway Municipal Airport, Chicago, IL
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 600,000
- Project Completion : 9/99
- World Duty Free, Americas, Inc.
- Boston Duty Free Shop
- Terminal E and Terminal C Concourse's
- Logan Int. Airport, East Boston, MA
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 700,000
- Project Completion : 7/99
- Three Chicago Duty Free Shop's
- Various Terminal's & Concourse's
- O'Hare International Airport, Chicago, IL
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 900,000
- Project Completion : 8/96
- Four Boston Duty Free Shop's
- Various Terminal's & Concourse's
- Logan Int. Airport, East Boston, Ma
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 1,100,000
- Project Completion : 12/95
- FHA - Crew Club Gift Shop
- O'Hare Hilton Hotel, O'Hare Int'l Airport
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 240,000
- Project Completion : 08/94
- Grove Sweet Shop - Terminal 5
- O'Hare International Airport
- Douglas J. Tobin Responsible for;
- Mechanical, and Electrical Engineering
- Project Construction Cost : $ 85,000
- Project Completion : 03/94
- Grove Sweet Shops - Temporary Kiosk
- American Airlines Terminal, JFK Int'l Airport, NY
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 28,000
- Project Completion : 04/94
- Grove Sweet Shops - Temporary Kiosk
- East & West Terminal, Buffalo Int'l Airport, NY
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 25,000
- Project Completion : 03/94
- Grove Sweet Shop
- Orlando Int'l Airport, Orlando, Florida
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 25,000
- Project Completion : 01/94
- Duty Free / News & Gift Shop
- American Airlines Terminal, Puerto Rico
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 60,000
- Project Completion : 12/93
- FHA - Duty Free / News & Gifts
- Bangor Int'l Airport, Bangor, Maine
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 100,000
- Project Completion : 12/93
- FHF - Duty Free Shop
- Airside No. 4, Orlando In'l. Airport
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 180,000
- Project Completion : 11/93
- DFI - Atheletes Foot Shop
- Pittsburgh Int'l Airport, Pittsburgh, PA
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 140,000
- Project Completion : 08/93
- Grove Sweet Shops - Term. A
- Bradley International Airport, Windsor Locks Ct.
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 20,000
- Project Completion : 07/93
- Grove Sweet Shops - Term. B
- Bradley International Airport, Windsor Locks Ct.
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 30,000
- Project Completion : 07/93
- Grove Sweet Shops - US Air Terminal
- LaGuardia Int'l Airport, NY
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 40,000
- Project Completion : 03/93
- FHA - Duty Free / News & Gifts
- Delta Terminal 1A, JFK Int'l Airport, NY
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 500,000
- Project Design Completion : 12/92
- DFI - Pittsburgh International Airport
- Concession Master Planning
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Value: $ 1,500,000
- Concessions A&E Cost : $ 200,000
- Complete : 1992
- DFI - Baltimore/Washington International Airport
- Douglas J. Tobin Responsible for;
- Turnkey Architecture & Engineering
- Project Construction Cost : $ 200,000
- Complete : 1991
8.0 Airport Master Plans & General Projects ;
- Executive Air Service, LLC
- Aircraft Storage Hangar
- Danbury Municipal Airport
- Danbury, Connecticut, US
- Douglas J. Tobin Responsible for;
- Turnket Architecture & Engineering
- Project Construction Value : $ 950,000
- Complete : 11/2001
- World Duty Free America's, Inc.
- Headquarter Corporate Offices
- Turnkey Engineering
- Douglas J. Tobin Responsible for;
- Office Electrical Fire Protection Systems, Fire Alarm Systems, HVAC Engineering
- Project Value: $ 450,000
- Project Completion : 6/99
- MIA-CFS - Corporate Offices - Building 706
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Cargo Terminal Office Architural Design
- Project Value: $ 250,000
- Project Completion : 3/97
- Albany County Municipal Airport
- Temporary Passenger Terminal
- Albany, NY
- Douglas J. Tobin Responsible for;
- Architecture & Structural Engineering
- Project Construction Cost : $ 500,000
- Project Completion : 08/96
- Albany County Municipal Airport
- F.I.S. Building Relocation
- Albany, NY
- Douglas J. Tobin Responsible for;
- Architecture & Structural Engineering
- Project Construction Cost : $ 250,000
- Project Completion : 08/96
- Norden Systems, Inc.
- Radar Tower Structural Engineering
- Memphis International Airport
- Memphis, TN
- Douglas J. Tobin Responsible for;
- Tower Engineering & Project Management
- Project Value: $ 750,000
- Norden Systems, Inc.
- Radar Tower Structural Engineering
- Anchorage International Airport
- Anchorage, Alaska
- Douglas J. Tobin Responsible for;
- Tower Engineering & Project Management
- Project Value: $ 750,000
- Norden Systems, Inc.
- Radar Tower Structural Engineering
- Houston International Airport
- Houston, Texas
- Douglas J. Tobin Responsible for;
- Tower Engineering & Project Management
- Project Value: $ 750,000
- MIA-CFS - Cargo Terminal
- Miami International Airport
- Miami, Fl.
- Architecture and Engineering
- Douglas J. Tobin Responsible for;
- Corporate Offices Retrofit
- Project Construction Cost : $ 500,000
- Project Completion : 1989
- Venice International Airport - Master Plan - 2010
- Douglas J. Tobin Responsible for;
- Passenger Terminal Design Development
- Venice, Italy
- Project Construction Cost : $ 3,000,000
- Project Completion : 1988
- SEA Milan
- Milano-Malpensa International Airport
- Milan, Italy
- Douglas J. Tobin Responsible for;
- MXP-2000 Master Planning
- Passenger Terminal Areas
- Project Construction Cost : $ 200,000,000
- Project Completion : 1986
- British Airways - Passenger Terminal Master Plan
- Terminal Renovation Competition
- JFK International Airport
- New York, N.Y.
- Project Construction Cost : $ 10,000,000
- Project Completion : 1984
- Pan Am - Passenger Terminal Renovation and
- Code Analysis
- JFK International Airport
- New York, N.Y.
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Mechanical Engineering
- Project Construction Cost : $ 3,000,000
- Project Completion : 1984
- United Airlines - Airport Passenger, Freight, Mail
- Terminal Master Plan
- O'Hare International Airport
- Chicago, Ill.
- Project Construction Cost : $ 20,000,000
- Project Completion : 1983
- Air Express International
- Interior Office Design Concept Development
- Stamford, Ct.
- Douglas J. Tobin Responsible for;
- Mechanical Engineering
- Project Construction Cost : $ 3,000,000
- Project Completion : 1982
- Singapore Airlines
- Maintenance Terminal Design
- Singapore International Airport
- Singapore
- Project Construction Cost : $ 2,000,000
- Project Completion : 1980
-
- SEA-TAC - Airport Master Planning
- Seattle Tacoma International Airport
- Seattle, Wash.
- Douglas J. Tobin Responsible for;
- Baggage Handling Systems Engineering
- Project Construction Cost : $ 500,000
- Project Completion : 1980
- Miami Airport Authority
- Cargo Terminal Area Master Plan
- Miami International Airport
- Miami, Florida
- Douglas J. Tobin Responsible for;
- Structural Engineering
- Mechanical Engineering
- Project Construction Cost : $ 10,000,000
- Project Completion : 1979
9.0 Education
- New York Institute of Technology
- Old Westbury, N.Y.
- Bachelor of Architecture (5-year)
- Magna Cum Laude
- CPR - 3.65
- Architectural Major
- Computer Minor
- Member Nu Upsilon Tau Honor Fraternity
- Graduated - 1980
- Norwalk State Technical College
- Norwalk, Ct.
- Associates Degree in Architectural
- Engineering (2-year)
- CPR - 3.74
- Member Tau Alpha Pi Honor Fraternity
- Graduated - 1976