5.0 Airport Passenger Terminal & Baggage Handling Systems Projects :

San Francisco International Airport
International Terminal
Baggage Handling Systems
Baggage Handling Systems Design Consultant
BHS Numerical Analysis and Systems Evaluation
Control Systems Specifications and Design Consultant
Project Value: $ 50,000,000
Project Completion: Current
New Athens International Airport
Spata, Greece
Baggage Handling Systems Design Consultant
BHS Numerical Analysis and Systems Evaluation
Specifications, X-Ray, Transfer, Early Bag Systems
Project Management Development Reports
Project Value: $ 60,000,000
Project Completion: Current
New Seoul Korea International Airport
Young Jong - Yong Yu Do
JungGu, Inchon Korea
Baggage Systems Consultant Team
Douglas J. Tobin Responsible for;
Contract Negotiations, Project Mgm't
Project Value: $ 200,000,000
Project Completion : 1997
Albany Municipal Airport
Albany, NY
Temporary Passenger Terminal
FIS Terminal Relocation Project
Douglas J. Tobin Responsible for;
Building Architecture and Engineering
Project Value: $ 700,000
Value Engineering (VE) Study for
New York Port Authority
International Arrivals
Building Redevelopment (IAB)
Passenger Terminal & Baggage Systems Consultant Team
Project Value: $ 29,500,000
Project Completion: 1996
Greater Buffalo International Airport
DKI Engineering USA with ARC Associates
Douglas J. Tobin Responsible for;
Master Plan - Baggage Handling Systems
Buffalo, New York
Project Value: $ 2,000,000
Project Completion: 1995
Newark International Airport
Value Engineering study for the
New York Port Authority
New FIS Terminal
Developed ten areas which PANY
could save $ 600,000 on the
Baggage Handling Systems.
Project Completion: 1994
JFK 2000 - Master Plan
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Baggage System Concept 3 Design
Project Construction Cost : $ 3,000,000
Project Completion : 1988
Venice International Airport - Master Plan - 2010
Douglas J. Tobin Responsible for;
Passenger Terminal Design Development
Venice, Italy
Project Construction Cost : $ 3,000,000
Project Completion : 1988
SEA Linate - Milano-Linate International Airport
Milan, Italy
Douglas J. Tobin Responsible for;
Structural Engineering
Baggage Handling System Design
Specification Documents
Project Construction Cost : $ 3,000,000
Project Completion : 1986
SEA Milan
Milano-Malpensa International Airport
Milan, Italy
Douglas J. Tobin Responsible for;
MXP-2000 Master Planning BHS
and Cargo Terminal Areas
Project Construction Cost : $ 200,000,000
Project Completion : 1986
British Airways - JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Baggage Handling Systems Engineering
Project Construction Cost : $ 3,200,000
Project Completion : 1985
Port Authority - JFK Master Plan
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Baggage Handling Systems Engineering
Project Construction Cost : $ 200,000,000
Project Completion : 1984
United Airlines - Airport Passenger, Freight, Mail
Baggae Handling Underground Terminal Master Plan
O'Hare International Airport
Chicago, Ill.
Baggage Handling Systems Design and Engineering
Project Construction Cost : $ 200,000,000
Project Completion : 1983
Alitalia - Passenger Terminal Baggage Handling
DaVinci International Airport
Rome, Italy
Douglas J. Tobin Responsible for;
BHS System Design and Engineering
Project Construction Cost : $ 5,000,000
Project Completion : 1981
SEA - Passenger Terminal Baggage Handling
Milano-Linate International Airport
Milan, Italy
Douglas J. Tobin Responsible for;
BHS System Design and Engineering
Project Construction Cost : $ 3,000,000
Project Completion : 1981
United Airlines - Design and Renovation
Denver International Airport
Denver, Colo.
Douglas J. Tobin Responsible for;
Baggage Handling Systems Engineering
Project Construction Cost : $ 2,500,000
Project Completion : 1981

6.0 Airport Cargo, Freight / Material Handling Systems Projects :

Advance Cargo Systems - Aerofloral - Frontier Airlines Cargo SA
X-Ray Facility - Cargo Terminal Building 701
Miami International Airport Cargo Area
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Architectural Engineering
MHS Engineering Cargo Systems
Overall Project Master Plan
Project Director - Construction Management
Engineering & Design - MHS Engineering, Cargo Systems
Phase 1A Project Value: $ 3,500,000
Project Completion :1999 - Beneficial Use and Occupancy 7/1999
Aerofloral - Aerokool - Frontier Airlines Cargo SA
Warehouse - Cargo Terminal Building
Miami International Airport Cargo Area
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Architectural Engineering
MHS Engineering Cargo Systems
Tilt-Tray Sorter Freight Sytems Engineering
Automatic Depaletizer Systems Engineering
Office Architecture and Engineering
Project Director - Construction Management
Engineering & Design - MHS Engineering, Cargo Systems
Phase 1A Project Value: $ 6,500,000
Project Completion :1998 - Beneficial Use and Occupancy 9/1998
Phase 1B Project Value: $ 1,200,000
Project Completion: 1999 - Beneficial Use and Occupancy 01/1999
Phase 2 Project Value: $ 8,500,000
Project Completion:2000 Under Preliminary Planning
Tampa Airlines Cargo SA
MIA-CFS - Cargo Terminal Building 708
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Architectural Engineering
MHS Engineering Cargo Systems
Office Architecture and Engineering
Communications and Security Systems Engineering
Project Director - Construction Management
Prelim. Design - MHS Engineering, Cargo Systems
Project Value: $ 2,200,000
Project Completion :1998
MIA-CFS - Cargo Terminal Building 706
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Architectural Engineering
MHS Engineering Cargo Systems
Office Architecture and Engineering
Project Director - Construction Management
Project Value: $ 1,200,000
Project Completion :1997
MIA-CFS - Cargo Terminal Building 707
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Prelim. Design - MHS Engineering, Cargo Systems
Project Value: $ 1,200,000
Project Completion : 1995
Carisam International Corp.
Duty Free International Inc.
Douglas J. Tobin Responsible for;
Material Handling Systems
Miami Carisam Warehouse Project
Miami, Florida
Project Construction Cost : $2,300,000
Material Handling Systems : $ 1,250,000
Project Completion : 1993
ISO Container Storage Park
Architectural Design Development
Project Engineering
Douglas J. Tobin Responsible for;
Site Planning, MHS Engineering
Project Construction Cost : $ 250,000
Project Completion : 1989
MIA-CFS - Cargo Terminal
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
MHS Engineering
Project Construction Cost : $ 500,000
Project Completion : 1989
HACTL Cargo Terminal 2 Expansion
Hong Kong
Douglas J. Tobin Responsible for;
Structural Engineering
Project Construction Cost : $ 3,000,000
Project Completion : 1988
Japan Airlines - JFK Master Plan
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Cargo Complex Development
Project Construction Cost : $ 3,000,000
Project Completion : 1988
Federal Express - Newark Freight Terminal
Port Authority Submittals
Douglas J. Tobin Responsible for;
Code Compliance Studies
Newark International Airport
Newark, N.J.
Project Construction Cost : $ 25,000,000
Project Completion : 1987
Pan Am Cargo Terminal Relocation
Miami International Airport
Douglas J. Tobin Responsible for;
Material Handling Systems Engineering
Miami, Florida
Project Construction Cost : $ 250,000
Project Completion : 1987
SATS Terminal 1A - 4A Expansion
Cargo Terminal Architectural Engineering
Douglas J. Tobin Responsible for;
Material Handling System Engineering
Mechanical Engineering
Project Construction Cost : $ 40,000,000
Project Completion : 1987
Miami International Airport
Miami Container Freight Station
Miami International Airport
Miami, Florida
Douglas J. Tobin Responsible for;
Structural Engineering
Project Construction Cost : $ 235,000
Project Completion : 1986
Emery Worldwide - Stage IV A - Phase 1
Dayton Hub Expansion
Dayton Airport
Dayton, Ohio
Douglas J. Tobin Responsible for;
Structural Engineering,
Fire Protection
Project Construction Cost : $ 10,000,000
Project Completion : 1986
Pan Am Cargo Terminal Relocation Study
Site Master Plan
Hangar 14 Cargo Terminal Conversion
Office Relocation
JFK International Airport
New York, N.Y.
Project Construction Cost : $ 15,000,000
Project Completion: 1986
SEA Milan
Milano-Malpensa International Airport
Milan, Italy
Douglas J. Tobin Responsible for;
MXP-2000 Master Planning
Cargo Terminal Areas
Project Construction Cost : $ 200,000,000
Project Completion : 1986
United Air Lines - Cargo Terminal
O'Hare International Airport
Chicago, Ill.
Douglas J. Tobin Responsible for;
Design Development and Master Planning
Architectural Design and Engineering
Project Construction Cost : $ 20,000,000
Project Completion : 1986
Efficiency Systems - Japan Air Lines
Cargo Terminal Revisions
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Material Handling Systems Engineering
Structural Engineering
Project Construction Cost : $ 350,000
Project Completion : 1985
Federal Express - MLD Center
Logan International Airport
Boston, Mass.
Douglas J. Tobin Responsible for;
Structural Engineering
Material Handling Systems Engineering
Project Construction Cost : $ 450,000
Project Completion : 1985
Miami International Airport
Cargo City 1 and Cargo City 2
Douglas J. Tobin Responsible for;
Master Planning
Structural Engineering
Miami, Florida
Project Construction Cost : $ 15,000,000
Project Completion : 1985
Federal Express - Boston BABO Facility
Interior Office Design
Cargo Terminal Conversion
Logan International Airport
Boston, Mass.
Douglas J. Tobin Responsible for;
HVAC, Fire Protection Engineering
Project Construction Cost : $ 450,000
Project Completion : 1984
Malaysian Airlines Systems - Cargo Terminal Design
Kuala Lumpur, Malaysia
Douglas J. Tobin Responsible for;
Structural Engineering
Material Handling Systems Engineering
Project Construction Cost : $ 20,000,000
Project Completion : 1984
SATS - Master Plan Cargo Development
Feasibility Study
Cargo Terminal Expansion
Singapore
Project Construction Cost : $ 40,000,000
Project Completion : 1984
Emery Worldwide - Stage III - Dayton Hub Expansion
Dayton Airport
Dayton, Ohio
Douglas J. Tobin Responsible for;
Structural Engineering
Fire Protection
Project Construction Cost : $ 10,000,000
Project Completion : 1983
Emery Worldwide - Hub Terminal Debottlenecking
Dayton Hub Terminal
Dayton Airport
Dayton, Ohio
Project Construction Cost : $ 1,000,000
Project Completion : 1983
Northwest Airlines - Cargo Terminal Design
Logan International Airport
Boston, Mass.
Douglas J. Tobin Responsible for;
Building Architecture
Structural Engineering
Project Construction Cost : $ 5,000,000
Project Completion : 1983
United Airlines - Airport Passenger, Freight, Mail
Terminal Master Plan
O'Hare International Airport
Chicago, Ill.
Project Construction Cost : $ 20,000,000
Project Completion : 1983
Air Express International
Air Freight Terminal
Architectural Design Development
JFK International Airport
New York, N.Y.
Project Construction Cost : $ 5,000,000
Project Completion : 1980
Cargo Terminal Renovation - Cargo Systems Expansions
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Material Handling Systems Engineering
Structural Engineering
Project Construction Cost : $ 3,000,000
Project Completion : 1982
Emery Worldwide - Hub Terminal Envelope Sortation
Dayton International Airport
Dayton, Ohio
Douglas J. Tobin Responsible for;
Structural Engineering
Material Handling System Engineering
Project Construction Cost : $ 1,200,000
Project Completion : 1982
Emery Worldwide - Freight Terminal Design
O'Hare International Airport
Chicago, Ill.
Douglas J. Tobin Responsible for;
Structural Engineering
Material Handling System Engineering
Project Construction Cost : $ 8,000,000
Project Completion : 1982
HACTL Cargo -Terminal 1A Expansion
Hong Kong
Douglas J. Tobin Responsible for;
Structural Engineering
Material Handling Systems Engineering
Project Construction Cost : $ 50,000,000
Project Completion : 1982
SAS - Cargo Terminal Design
Arlanda, Sweden
Douglas J. Tobin Responsible for;
Architectural Design Development
Project Construction Cost : $ 9,000,000
Project Completion : 1982
Emery Worldwide - Hub Terminal Design - Phase 1
Airport Master Planning - Dayton Airport
Dayton, Ohio
Douglas J. Tobin Responsible for;
Airport Master Planning
Project Construction Cost : $ 200,000,000
Project Completion : 1981
British Airways
Cargo Terminal Port Authority
Documentation and Submittals
JFK International Airport
New York, N.Y.
Project Construction Cost : $ 250,000
Project Completion : 1980
AEI - Freight Terminal Study
Newark International Airport
Newark, N.J.
Douglas J. Tobin Responsible for;
Cargo Terminal Plannning and Structural Engineering
Project Construction Cost : $ 250,000
Project Completion : 1979
Emery Worldwide
Air Freight Terminal Design
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Cargo Terminal Planning
Structural and Mechanical Engineering
Project Construction Cost : $ 1,000,000
Project Completion : 1979
Eastern Airlines
Air Freight Terminal Design
Atlanta Hartsfield International Airport
Atlanta, Georgia
Douglas J. Tobin Responsible for;
Cargo Handling Systems Engineering
Structural and Mechanical Engineering
Project Construction Cost : $ 2,300,000
Project Completion : 1979
AEI - Air Freight Terminal Design
O'Hare International Airport
Chicago, Ill.
Douglas J. Tobin Responsible for;
Cargo Handling Systems Engineering
Structural and Mechanical Engineering
Project Construction Cost : $ 15,000
Project Completion : 1978
AEI - Air Freight Terminal Design
Frankfurt International Airport
Frankfurt, West Germany
Douglas J. Tobin Responsible for;
Cargo Handling Systems Engineering
Structural and Mechanical Engineering
Project Construction Cost : $ 210,000
Project Completion : 1978
Miami Airport Authority
Cargo Terminal Area Master Plan
Miami International Airport
Miami, Florida
Douglas J. Tobin Responsible for;
Airport Cargo Termianl Master Planning
Project Construction Cost : $ 10,000,000
Project Completion : 1978

7.0 Airport Concessions Projects :

Weitnauer America, Inc.
Weitnauer America Duty Free Shop
Termianl C - Concourse 3
Newark International Airport, NJ
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 1,200,000

Project Completion : 10/2001

World Duty Free, Americas, Inc.
British Airways Duty Free Shop
British Airways Terminal
JFK International Airport, NY
Douglas J. Tobin Responsible for;
Turnkey Engineering
Project Construction Cost : $ 2,400,000
Project Completion : 03/2000
World Duty Free, Americas, Inc.
Chicago Midway WDFA Temporaries
Terminal A, B, C Concourse's
Various News & Gifts Architecture and Engineering
Midway Municipal Airport, Chicago, IL
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 600,000
Project Completion : 9/99
World Duty Free, Americas, Inc.
Boston Duty Free Shop
Terminal E and Terminal C Concourse's
Logan Int. Airport, East Boston, MA
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 700,000
Project Completion : 7/99
Three Chicago Duty Free Shop's
Various Terminal's & Concourse's
O'Hare International Airport, Chicago, IL
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 900,000
Project Completion : 8/96
Four Boston Duty Free Shop's
Various Terminal's & Concourse's
Logan Int. Airport, East Boston, Ma
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 1,100,000
Project Completion : 12/95
FHA - Crew Club Gift Shop
O'Hare Hilton Hotel, O'Hare Int'l Airport
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 240,000
Project Completion : 08/94
Grove Sweet Shop - Terminal 5
O'Hare International Airport
Douglas J. Tobin Responsible for;
Mechanical, and Electrical Engineering
Project Construction Cost : $ 85,000
Project Completion : 03/94
Grove Sweet Shops - Temporary Kiosk
American Airlines Terminal, JFK Int'l Airport, NY
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 28,000
Project Completion : 04/94
Grove Sweet Shops - Temporary Kiosk
East & West Terminal, Buffalo Int'l Airport, NY
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 25,000
Project Completion : 03/94
Grove Sweet Shop
Orlando Int'l Airport, Orlando, Florida
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 25,000
Project Completion : 01/94
Duty Free / News & Gift Shop
American Airlines Terminal, Puerto Rico
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 60,000
Project Completion : 12/93
FHA - Duty Free / News & Gifts
Bangor Int'l Airport, Bangor, Maine
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 100,000
Project Completion : 12/93
FHF - Duty Free Shop
Airside No. 4, Orlando In'l. Airport
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 180,000
Project Completion : 11/93
DFI - Atheletes Foot Shop
Pittsburgh Int'l Airport, Pittsburgh, PA
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 140,000
Project Completion : 08/93
Grove Sweet Shops - Term. A
Bradley International Airport, Windsor Locks Ct.
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 20,000
Project Completion : 07/93
Grove Sweet Shops - Term. B
Bradley International Airport, Windsor Locks Ct.
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 30,000
Project Completion : 07/93
Grove Sweet Shops - US Air Terminal
LaGuardia Int'l Airport, NY
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 40,000
Project Completion : 03/93
FHA - Duty Free / News & Gifts
Delta Terminal 1A, JFK Int'l Airport, NY
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 500,000
Project Design Completion : 12/92
DFI - Pittsburgh International Airport
Concession Master Planning
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Value: $ 1,500,000
Concessions A&E Cost : $ 200,000
Complete : 1992
DFI - Baltimore/Washington International Airport
Douglas J. Tobin Responsible for;
Turnkey Architecture & Engineering
Project Construction Cost : $ 200,000
Complete : 1991

8.0 Airport Master Plans & General Projects ;

Executive Air Service, LLC
Aircraft Storage Hangar
Danbury Municipal Airport
Danbury, Connecticut, US
Douglas J. Tobin Responsible for;
Turnket Architecture & Engineering
Project Construction Value : $ 950,000
Complete : 11/2001

World Duty Free America's, Inc.
Headquarter Corporate Offices
Turnkey Engineering
Douglas J. Tobin Responsible for;
Office Electrical Fire Protection Systems, Fire Alarm Systems, HVAC Engineering
Project Value: $ 450,000
Project Completion : 6/99
MIA-CFS - Corporate Offices - Building 706
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Cargo Terminal Office Architural Design
Project Value: $ 250,000
Project Completion : 3/97
Albany County Municipal Airport
Temporary Passenger Terminal
Albany, NY
Douglas J. Tobin Responsible for;
Architecture & Structural Engineering
Project Construction Cost : $ 500,000
Project Completion : 08/96
Albany County Municipal Airport
F.I.S. Building Relocation
Albany, NY
Douglas J. Tobin Responsible for;
Architecture & Structural Engineering
Project Construction Cost : $ 250,000
Project Completion : 08/96
Norden Systems, Inc.
Radar Tower Structural Engineering
Memphis International Airport
Memphis, TN
Douglas J. Tobin Responsible for;
Tower Engineering & Project Management
Project Value: $ 750,000
Norden Systems, Inc.
Radar Tower Structural Engineering
Anchorage International Airport
Anchorage, Alaska
Douglas J. Tobin Responsible for;
Tower Engineering & Project Management
Project Value: $ 750,000
Norden Systems, Inc.
Radar Tower Structural Engineering
Houston International Airport
Houston, Texas
Douglas J. Tobin Responsible for;
Tower Engineering & Project Management
Project Value: $ 750,000
MIA-CFS - Cargo Terminal
Miami International Airport
Miami, Fl.
Architecture and Engineering
Douglas J. Tobin Responsible for;
Corporate Offices Retrofit
Project Construction Cost : $ 500,000
Project Completion : 1989
Venice International Airport - Master Plan - 2010
Douglas J. Tobin Responsible for;
Passenger Terminal Design Development
Venice, Italy
Project Construction Cost : $ 3,000,000
Project Completion : 1988
SEA Milan
Milano-Malpensa International Airport
Milan, Italy
Douglas J. Tobin Responsible for;
MXP-2000 Master Planning
Passenger Terminal Areas
Project Construction Cost : $ 200,000,000
Project Completion : 1986
British Airways - Passenger Terminal Master Plan
Terminal Renovation Competition
JFK International Airport
New York, N.Y.
Project Construction Cost : $ 10,000,000
Project Completion : 1984
Pan Am - Passenger Terminal Renovation and
Code Analysis
JFK International Airport
New York, N.Y.
Douglas J. Tobin Responsible for;
Structural Engineering
Mechanical Engineering
Project Construction Cost : $ 3,000,000
Project Completion : 1984
United Airlines - Airport Passenger, Freight, Mail
Terminal Master Plan
O'Hare International Airport
Chicago, Ill.
Project Construction Cost : $ 20,000,000
Project Completion : 1983
Air Express International
Interior Office Design Concept Development
Stamford, Ct.
Douglas J. Tobin Responsible for;
Mechanical Engineering
Project Construction Cost : $ 3,000,000
Project Completion : 1982
Singapore Airlines
Maintenance Terminal Design
Singapore International Airport
Singapore
Project Construction Cost : $ 2,000,000
Project Completion : 1980
SEA-TAC - Airport Master Planning
Seattle Tacoma International Airport
Seattle, Wash.
Douglas J. Tobin Responsible for;
Baggage Handling Systems Engineering
Project Construction Cost : $ 500,000
Project Completion : 1980
Miami Airport Authority
Cargo Terminal Area Master Plan
Miami International Airport
Miami, Florida
Douglas J. Tobin Responsible for;
Structural Engineering
Mechanical Engineering
Project Construction Cost : $ 10,000,000
Project Completion : 1979

9.0 Education

New York Institute of Technology
Old Westbury, N.Y.
Bachelor of Architecture (5-year)
Magna Cum Laude
CPR - 3.65
Architectural Major
Computer Minor
Member Nu Upsilon Tau Honor Fraternity
Graduated - 1980
Norwalk State Technical College
Norwalk, Ct.
Associates Degree in Architectural
Engineering (2-year)
CPR - 3.74
Member Tau Alpha Pi Honor Fraternity
Graduated - 1976

DT-012000ares-Page1-a.wpd

SD 04.01.001Web