Final Assembly

ARP Main Studs and Main Cap installed, clearences check
Crankshaft, Bearings, and Oil Piston Squirters installed
Piston skirts and Oil Jet clearences check
Main Cap Torqued, Crankshaft, Bearings, and Main Cap clearences check, check, and check
Connecting Crower Rods and CP Pistons Installed
Taking all the new parts out
Head and Block operation in progress
Measuring Spring Install Height
Checking Spring Seat Pressure and Install Height
Checking Turbo Cam Bearing Clearances
Measuring Turbo Cam, Cam Towers, and Spring Clearance
Checking Valve to Piston Clearance on #1 Cylinder
Degreeing in the camshaft to cam centerline
Balancing
Blueprinting
Valve Springs Installed, Open and Close Pressure Check
Head shaved, Valves installed and clearence check
Crank, Rods, and Pistons installed
ARP Head Studs installed
KA24DE Cometic Headgasket with front timing cover cut off
Test fitting Cometic Headgasket
Spraying on copper coating
Front timing cover installed
Installing headgasket along with silicon sealant on front timing cover
Installing the Head and torquing it down
Installing Turbo Cam and cam towers
Adjustable Solid Rocker Arms Installed
Intake Side Solid Rocker Adjustable Arms
Test fitting Intake Manifold
Test fitting Throttle Bodies with custom machine O-rings
Wide Open Throttles!!!!
Superior Flow to the intake valves
Complete Intake Manifold test fitment
Power steering pump bracket custom machined to make room for manifold and water outlet
Test fitting Turbine Housing, Tial Wastegate and IAP Turbo Manifold.