New Age Planning
Objective: Zero inventory,
Just in Time Delivery.
Methodology:
1.
Systems
and training making it possible for everybody to have the information they need
to succeed. From vendor to operator, shipping clerk to customer.
2.
Kan-Ban
as much as possible.
3.
Quality
driven through process control at all levels.
4.
Identify
each long-lead time item on all BOMs.
5.
Identfiy
process constraints (bottlenecks).
6.
Establish
automated vendor grading system.
7.
Bar-code
everything from shop work orders to shipping/receiving documents.
8.
Handle
each job as a unique project.
9.
Know
when to expedite before losing schedule ability.
10.
Implement
Continuous Process Improvement at all levels.
11.
Maintain
configuration control including tooling and processes
12.
Rigorous
application of Request for Corrective Action both internal and external.
13.
Delegate
project responsibility for each job order on a rotating basis.
14.
Systems
training and maximum use of office automation.
15.
Posted
measurement performance. (Inventory/on-time deliveries)
16.
Three
tickets in each manager’s/supervisor’s pocket each day.
17.
Apply
Supplier Improvement Practices. (Sanyo, 1983-86)
18.
JIT
II as much as possible.